US Navy/Lennar Mare Island
Panel Upgrades, New Wiring, Park Lighting
and Troubleshooting
American Electrical works with Maintenance Engineer
Glen Moniz to control the cost of electrical maintenance
at the City of Hercules' administrative offices, police
station and parks.
We were called to install a 208/120-volt, 400-amp
electrical service for the new temporary police station.
This also required installing a separate electrical panel
for the existing back-up generator so that the IT room would continue to have power during
emergency conditions.
American Electrical also restored the lighting systems for City of Hercules' major public parks.
And we remain on call to ensure that the Refugio Park and Tennis Court's lighting works correctly
at all times.